Industrial Ovens, Dryers, Kilns & Furnaces Home Page

Industrial Ovens, Dryers, (Driers), Furnaces and Coolers

All Solutions Designed, Built and Witness Tested at Our UK Works Without Sub-Contractors

HOME

EMAIL Ian Dawson ian.dawson@caltherm.co.uk

PHONE +44 (0)1782 563865

FAX +44 (0)1782 561607

EMAIL John Chesters john.chesters@caltherm.co.uk

NEWS

AIRCRAFT GLASS SURFACE FINISHING

This order from Pilkington Aerospace gave Caltherm their first opportunity to use the Drawing Office 3D modelling skills.  The order, for two glass heat treatment furnaces, required a complex material system handling in a compact vertical arrangement.  

3D design representation of high temperature infra-red glass furnace
Drawing the plant in 3D allowed all parties - the customer, design team and the workshop engineers - to visualise the whole plant before build commenced.  By displaying different layers of the drawing various parts of the furnace can be seen, for example, the frame, the drive and the conveyor system, and the infra-red element system.
Glass heat treatment furnace shown operating in Caltherms Factory prior to delivery

Entire Mechanical build by Caltherm

The furnaces are used to process glass via electric infra-red elements in either side of the furnace wall at up to 850°C.  Temperature uniformity is improved by a variable speed fan mounted through the roof of the furnace. 

Glass components are lifted individually into the furnace on a variable-speed motor-driven chain hoist.  The whole furnace is mounted on a frame to raise it by 2.5m.  With operator gates below, the furnace is manually loaded, the glass being lifted through two pneumatic doors. The whole furnace operation is controlled and sequenced by an NT-based PC SCADA system operating via Eurotherm instrumentation. Temperature control is held accurately to set point via thyristors.

Deliver, Install and Commission by Caltherm

To complete the £240,000 package Caltherm delivered and installed and commissioned the first furnace in the West Midlands.  The second unit was demonstrated operating in the Caltherm works prior to delivery and installation in South America by Caltherm.

 

CLICK here to see other Pilkington equipment supplied by Caltherm (2) CLICK here to see other Pilkington equipment supplied by Caltherm (3)
   

CLICK TO RETURN TO 'BROCHURE' PAGES

CLICK TO RETURN TO CALTHERM HOME PAGE

                       All Solutions Designed, Built and Witness Tested at Our UK Works Without Sub-Contractors

News – current projects

Technical info & calc's

Site map

Contact us

Company profile

How to Find Us


 

Industrial Ovens & Dryers

CONTACT US: Ian Dawson, Sales & Marketing Manager - ian.dawson@caltherm.co.uk

       John Chesters, Internal Sales - john.chesters@caltherm.co.uk

Caltherm Limited, Rowhurst Industrial Estate

Newcastle-under-Lyme, Staffordshire, ST5 6BD, UK

Tel: +44 (0)1782 563865, Fax +44 (0)1782 561607

Industrial Ovens & Dryers